IJMTES – OPTIMIZATION CONSTRUCTION COST AND TIME NEW TECHNICS AND NEW MATERIALS

Journal Title : International Journal of Modern Trends in Engineering and Science

Paper Title : OPTIMIZATION CONSTRUCTION COST AND TIME NEW TECHNICS AND NEW MATERIALS

Author’s Name : K Dhinesh kumar | Dr M Mariappan  unnamed

Volume 03 Issue 09 2016

ISSN no:  2348-3121

Page no: 94-97

Abstract – Construction management is an important branch civil engineering, which deals with effective and efficient management of any construction work. The essentials of construction management are functional utility, structural stability, economy, speed and quality of construction. In this thesis work, estimation and costing of the physical education building in terms of optimization time and cost. For this particular building, analyzes is going to be performed in terms of optimizing time and cost.  In analysis part, for this building scheduling will be performed by using   new techniques and new materials. Alternatives of the new material and techniques to reducing the time and cost. Then factors are introduced to increase the duration of the project, then by schedule crunching and project crashing technique optimization of time and cost will be found ensured early completion of the project. The project also includes visiting of some construction companies and conducts questioner surveys then analysis the difficulties due to cost and time suggests improvement for the phase of the construction project.  

Keywords— Construction Management; Materials ; Techniques

Reference

  1. Cstro-Lacouture, D.,suer, G.,Gonzalez-Joaqui, j., and Yates J. (2009). Construction Project Schedulingwith time,cost and material
  2. EI-Kholy.(2013) “ New Aspects in Time-Cost Tradeoff Analysis”. Associate prof,Dept of civil engg
  3. Ezeldinn, A. and Soliman, A. (2009) “hybrid Time-cost optimization of Nonserial Reptitive Construction Projests.” J.constr. Eng manage.,135(1),42-55
  4. Feng.C., Liu., and Burns , S. (2000) “stoshastic Construction Time-Cost trade off analysis” J. Comput.Civil .Eng
  5. Geem, Z. (2010). “Multi objective Optimization Time-Cost Trade off Using Harmony search”. J.constr. Eng manage.,135(1),42-55
  6. Liu,L., Burns , S., and Feng C. “Construction Time- Cost Tradeoff Analysis Using LP/IP Hybird Method
  7. San Cristobal (2009) “Time,Cost and Quality in a Road Building Projects”
  8. Naoum, S. (1994) “Critical Analysis of Time Cost of Management and Traditiona Contracts.”
  9. http://reprocessors.databases.org.uk/search.html
  10. http://2009.lifecyclebuilding.org.
Scroll Up